Cut list to truck

Cut list to crate to truck

Import the list. Pack the crate. Load the truck. Jelly Flow keeps prep, the floor, and shipping on one job — for any shop that cuts, builds, and ships.

Plan before you buy

Units, cut plans, and packages first. Build for the crate, not the order you typed.

Floor follows the pack

A priority matrix (a build order) sorts the units. The shop builds the way crates pack.

Sign off the load

BOL paperwork, crate loading, and truck departure sit on the same timeline as the cut list.