Gantt Scheduling

A Real Gantt View for Your Production Floor

Every checklist row, every active card, every column — flattened into a single scrollable timeline. Group by card or column, scope to a week or a quarter, and schedule directly from the bars.

Active Jobs · This week
1w1m3m6m
MTWTFSS
Job 4421 · Cabinet run
Job 4422 · Stair install
Job 4423 · Counter top

Illustrative — your real Gantt renders day-precise bars at the checklist row level.

What it does

A timeline that knows about jobs.

Row-Level Scheduling

Every checklist row across every active card flattens into one timeline. Schedule individual rows, not just whole cards.

  • Row = a job step
  • Card-grouped or column-grouped
  • Drag to reschedule (with permissions)

Group by Card or Column

Toggle between job-centric (each card is a group) and stage-centric (each column is a group) layouts in one click.

  • Cards mode (default)
  • Columns mode
  • Per-user preference saved

Date-Scoped Views

Filter to 1 week, 1 month, 3 months, 6 months, or all time. The axis re-scales smoothly to fit.

  • 1w / 1m / 3m / 6m / all
  • Today marker
  • Auto-scroll to current week

Built for Big Boards

Hundreds of cards across dozens of columns? Virtualized scrolling keeps the timeline usable on large monitors.

  • Virtualized rows
  • Sticky group headers
  • Mobile-friendly compact mode

Permission-Aware

Read-only by default. Planners with the right permissions can drag bars to reschedule directly from the Gantt.

  • Role-based scheduling
  • Per-card override
  • Audit trail per move

Click-Through Editing

Click any bar to open the underlying card on its Production tab. Sign off, comment, attach docs — without leaving context.

  • Modal opens to Production tab
  • Inline checklist sign-off
  • Return to the Gantt with one click
Where it lives

One click away from every production board.

The Gantt view is a built-in mode on every Production board. Switch from Kanban to Gantt the same way you would switch to Calendar or Table — no separate tool.

  • Flatten every active card into one schedule
  • Switch grouping with one click (cards vs. columns)
  • Drag bars to reschedule (planners only)
  • Click any bar to open the card on its Production tab

Jelly Production · Enterprise

The Gantt ships with Jelly Production — not as its own Power Up. Explore the full production workspace or talk to Enterprise sales.

Schedule your shop floor visually.

No more spreadsheet whiteboards. Drag, drop, sign off.

See Pricing